Top 10 Long-Duration Energy Storage Companies Transforming Grid Resilience in 2026
The top long-duration energy storage companies advancing multi-day batteries, flow systems, thermal storage, compressed air, and grid resilience worldwide.
1. Introduction
Overview of the Global Long-Duration Energy Storage Industry
The global long-duration energy storage industry has moved from a collection of pilot technologies into an increasingly diversified infrastructure segment spanning pumped hydro, compressed-air storage, liquid-air storage, flow batteries, iron-air batteries, thermal storage, gravity systems and thermodynamic platforms. Pumped-storage hydropower remains the dominant form of large-scale electricity storage and can hold roughly 30 times as much energy as the world's utility-scale batteries, while typical pumped-hydro discharge durations range from several hours to multiple days. At the same time, newer LDES developers are progressing projects in 20+ countries, and the industry's announced project pipeline had reached roughly 0.22 TW by late 2024. Utilities remain the primary adopters, but data centers, industrial facilities, renewable-energy developers, municipal resilience programs and remote-power operators are becoming increasingly important end users.
The broader storage deployment environment is also expanding rapidly. Global battery-storage additions reached 108 GW in 2025, representing a large installed ecosystem into which longer-duration technologies can integrate as renewable penetration increases. LDES differs from conventional short-duration batteries by targeting applications requiring 8, 10, 24, 100 or more hours of continuous discharge, depending on the technology. Current competition is therefore based less on one dominant chemistry and more on application fit: iron-air systems address multi-day reliability, flow batteries emphasize high cycle life, compressed-air and liquid-air platforms target utility-scale storage, and thermal systems can support electricity or industrial heat. This diversity makes the competitive structure fundamentally different from the more standardized lithium-ion battery industry.
Market Evolution and Growth Drivers
Long-duration energy storage adoption accelerated between 2023 and 2026 as governments and grid operators began defining explicit storage-duration requirements rather than treating all batteries as interchangeable resources. The United Kingdom established a cap-and-floor mechanism for LDES and defines qualifying projects under the scheme around systems providing at least 8 hours of continuous output. California has a procurement requirement of 1,000 MW for long-duration storage, while New South Wales maintains an 8-hour minimum duration and targets 2 GW and 16 GWh of LDES by 2030. These policies reflect a grid-management challenge created by growing solar and wind penetration: conventional 2–4-hour batteries can shift daily peaks, but renewable-heavy systems increasingly require overnight, multi-day and seasonal flexibility.
Technology improvements are reinforcing this policy momentum. Form Energy's iron-air architecture is designed for 100-hour discharge, Energy Dome is commercializing approximately 10-hour CO₂ systems, Hydrostor is developing 8-hour-plus advanced compressed-air projects, and Invinity offers vanadium-flow configurations extending to 24 hours in specific deployments. Digital controls, predictive analytics, automated manufacturing and AI-assisted quality inspection are also entering LDES production; e-Zinc, for example, reported the use of AI-based inspection methods in 2026 to improve electrolyte-related quality control. The resulting industry is evolving from one-off demonstrations toward repeatable modular systems, larger factories and contracted utility portfolios.
2. Top 5 Latest Trends in the Long-Duration Energy Storage Industry
Multi-day electrochemical storage is reaching commercial contracts
Thermodynamic storage is scaling into 10-hour utility projects
AI data centers are emerging as a major LDES demand source
Governments are adopting explicit 8-hour-plus procurement frameworks
Non-lithium technologies are diversifying across flow, thermal, gravity and mechanical systems
Trend 1: Multi-Day Electrochemical Storage Is Reaching Commercial Contracts
Multi-day batteries have become one of the most important trends among the Top Companies in the Long-Duration Energy Storage Industry because projects are progressing from laboratory validation to utility and commercial contracts. Form Energy's rechargeable iron-air battery is designed to discharge continuously for 100 hours, enabling storage across several cloudy, windless or high-demand days rather than only evening peaks. In March 2026, Form announced an agreement associated with up to 12 GWh of iron-air capacity for AI data-center infrastructure. e-Zinc is developing zinc-based systems targeting approximately 24 hours of storage, while ESS continues deploying iron-flow architecture designed for roughly 4–12-hour applications. These technologies address different durations, but all reduce dependence on conventional lithium-ion systems for extended grid events.
Trend 2: Thermodynamic Storage Is Scaling Into 10-Hour Utility Projects
Thermodynamic LDES technologies are moving into projects measured in hundreds of megawatt-hours. Energy Dome's CO₂ Battery compresses and liquefies carbon dioxide during charging and reverses the process during discharge, with systems commonly configured for 10-hour storage. Its Sardinia project is designed at 20 MW/200 MWh, while a project announced in Victoria in July 2026 is also configured at 20 MW/200 MWh. Highview Power is developing a 300 MWh liquid-air energy-storage plant at Carrington in the United Kingdom, while Hydrostor's Willow Rock advanced compressed-air project in California is designed for 500 MW/4,000 MWh, equivalent to 8 hours. These systems can use industrial-scale equipment and storage vessels rather than large quantities of electrochemical cells, providing a distinct path to utility-scale LDES.
Trend 3: AI Data Centers Are Emerging as a Major LDES Demand Source
Artificial-intelligence infrastructure is creating a new customer category for long-duration energy storage because modern data centers require continuous electricity while power demand is rising faster than grid upgrades in some regions. Form Energy's 12 GWh agreement with Crusoe announced in 2026 directly connects iron-air technology with AI data-center expansion. Energy Dome has also announced data-center-oriented agreements, including a 23 MW/200 MWh Irish project connected with Google and a 10-hour, 19 MW project with Salt River Project in Arizona. Flow batteries, thermal storage and hybrid hydrogen systems can also support data-center campuses where operators require resilience beyond the 2–4 hours typically associated with conventional battery backup. This emerging demand could reshape system design toward higher availability, modular deployment, black-start capability and integration with renewable generation.
Trend 4: Governments Are Adopting Explicit 8-Hour-Plus Procurement Frameworks
Policy makers are increasingly separating long-duration storage from conventional battery procurement. California's planning framework includes a 1,000 MW LDES procurement requirement established in 2023, and the state has supported multiple non-lithium demonstration projects targeting at least 8 hours of discharge. The United Kingdom opened its first cap-and-floor LDES application window in April 2025, creating a structured mechanism for projects capable of providing extended storage. New South Wales retains an 8-hour statutory minimum and has set an objective of 28 GWh of long-duration storage by 2034, including 16 GWh and 2 GW by 2030. Such frameworks matter because technologies with longer development periods and different capital structures cannot always compete directly with 2-hour lithium-ion systems in standard capacity auctions.
Trend 5: Non-Lithium Technologies Are Diversifying Across Flow, Thermal, Gravity and Mechanical Systems
The LDES sector is becoming a portfolio of technologies rather than a contest to identify 1 universal replacement for lithium-ion batteries. Invinity's vanadium-flow systems can be configured from approximately 3 hours to 18 hours, while Pacific Northwest National Laboratory is evaluating an Endurium configuration extending to 24 hours. Energy Vault operates a 293 MWh California resilience project capable of delivering electricity for up to 48 hours using a hybrid hydrogen-and-battery architecture, and its gravity-storage platforms target multi-hour applications. Antora Energy stores electricity as heat in carbon blocks for multi-day industrial applications, while RheEnergise is developing high-density hydro systems targeting 6–20 hours. This diversification allows project developers to select technologies according to site geology, duration, temperature requirements, cycling frequency and end-use needs.
3. Top 10 Companies in the Long-Duration Energy Storage Industry
The following 10 companies are presented based on technology relevance, deployment activity, project scale, manufacturing progress, storage duration and geographic presence rather than as a strict ranking.
1. Form Energy
Company Overview: Form Energy was founded in 2017 and has developed from an R&D-focused startup into a commercial iron-air battery manufacturer. Its Form Factory 1 manufacturing site in West Virginia exceeds 550,000 square feet, while the company's validation program has involved more than 21,500 subscale cells, 650 full-scale cells and 113 modules. Headquarters: Somerville, Massachusetts, United States. Core Long-Duration Energy Storage Expertise: Form's rechargeable iron-air chemistry uses reversible rusting to store electricity for up to 100 hours, positioning it for multi-day renewable balancing and resource adequacy. Major Products and Services: The company supplies utility-scale battery systems and has announced projects with utilities, renewable developers and data-center operators, including a 12 GWh agreement linked to AI infrastructure announced in 2026.
2. Energy Dome
Company Overview: Energy Dome was founded in Milan in 2020 by a team whose founders had previously worked together for more than 15 years and participated in development of over 500 MW of energy projects. Headquarters: Milan, Italy. Core Long-Duration Energy Storage Expertise: Its CO₂ Battery stores electricity by compressing and liquefying carbon dioxide in a closed thermodynamic cycle, with configurations designed primarily for approximately 4–24 hours of discharge and expected round-trip efficiency in the 75–80% range. Major Products and Services: The company is scaling 10-hour installations including a 20 MW/200 MWh system in Sardinia, a similarly sized project in Victoria and a 23 MW/200 MWh project announced in Ireland. Its commercial portfolio now spans Europe, Australia and the United States.
3. ESS Tech, Inc.
Company Overview: ESS has developed iron-flow energy-storage technology since 2011 and operates from Wilsonville, Oregon. Headquarters: Wilsonville, Oregon, United States. Core Long-Duration Energy Storage Expertise: Its systems use iron, salt and water in an aqueous electrolyte rather than lithium-ion chemistry and are designed for approximately 4–12 hours of storage. Flow-battery architecture enables energy capacity to be scaled independently from power equipment, making the technology suitable for renewable shifting and grid-support applications. Major Products and Services: ESS offers Energy Warehouse and larger-scale Energy Center architectures. In 2026, the company commissioned 2 iron-flow systems at the Turlock Irrigation District's solar-over-canal project in California, while a separate Salt River Project pilot is planned around 50 MWh of long-duration capacity.
4. Highview Power
Company Overview: Highview Power is a United Kingdom-based LDES developer that has spent more than 1 decade commercializing liquid-air energy storage for utility grids. Headquarters: London, United Kingdom. Core Long-Duration Energy Storage Expertise: Its LAES process uses electricity to cool air into a cryogenic liquid, stores that liquid in insulated tanks and later expands it through turbines to regenerate electricity. Major Products and Services: Highview's Carrington project is designed for approximately 300 MWh, with full LAES operation expected in 2027. The company has also outlined Millennium-series facilities capable of reaching 3.2 GWh and previously announced plans for 4 UK plants totaling 10 GWh of storage, with individual projects designed for more than 12 hours of output. The technology targets grid balancing, renewable firming and capacity services without relying on geographically constrained reservoirs.
5. Hydrostor
Company Overview: Hydrostor was founded in 2010 and has operating and development teams in Toronto, Melbourne and Denver. Headquarters: Toronto, Ontario, Canada. Core Long-Duration Energy Storage Expertise: The company develops Advanced Compressed Air Energy Storage, or A-CAES, combining underground compressed-air caverns with thermal-management systems to provide extended-duration electricity storage. Its design life can exceed 50 years, giving the technology an infrastructure-style operating profile. Major Products and Services: Willow Rock in California is approved at 500 MW/4,000 MWh, providing 8 hours of discharge, while the Silver City project in New South Wales is designed for 200 MW/1,600 MWh and at least 8 hours. Hydrostor also developed the Goderich facility in Canada as the first commercially contracted A-CAES project of its type.
6. Invinity Energy Systems
Company Overview: Invinity Energy Systems was formed in 2020 through the merger of redT energy and Avalon Battery, combining 2 established vanadium-flow technology platforms. Headquarters: London, United Kingdom. Core Long-Duration Energy Storage Expertise: Invinity manufactures vanadium redox-flow batteries in which liquid electrolytes store energy externally from the electrochemical stack, allowing long operating life and repeated deep cycling. Its newer systems address discharge durations from roughly 3–18 hours, while a Pacific Northwest National Laboratory deployment is evaluating operation extending to 24 hours. Major Products and Services: The portfolio includes VS3 systems and the Endurium platform. The Energy Superhub Oxford installation incorporates 27 VS3 batteries providing 2 MW/5 MWh, while the Copwood project reached delivery of a 20.7 MWh first phase during 2025.
7. Energy Vault
Company Overview: Energy Vault was founded in 2017 and develops multiple storage architectures rather than relying on a single chemistry. Headquarters: Its international headquarters is in Lugano, Switzerland, while its United States headquarters is in Westlake Village, California. Core Long-Duration Energy Storage Expertise: The company works across gravity storage, battery systems, hydrogen-based resilience and software-controlled hybrid configurations, with long-duration products designed for approximately 4–24 hours and selected projects extending further. Major Products and Services: The Calistoga Resiliency Center in California provides 8.5 MW and 293 MWh, supporting up to 48 hours of energy delivery through a hybrid hydrogen-and-battery design. Energy Vault has also developed gravity projects including the 25 MW/100 MWh Rudong system and a 17 MW/68 MWh installation at Zhangye in China.
8. Antora Energy
Company Overview: Antora Energy was co-founded in 2018 and operates a manufacturing and engineering base focused on electrifying industrial heat. Headquarters: San Jose, California, United States. Core Long-Duration Energy Storage Expertise: Antora converts electricity into high-temperature thermal energy stored in solid carbon blocks, enabling multi-day storage without an electrochemical battery pack. Stored heat can be supplied directly to industrial processes or converted back to electricity where required. Major Products and Services: The company operates a 50,000-square-foot manufacturing facility in San Jose and is developing modular thermal-battery systems that can scale from megawatt to gigawatt-class installations. Its announced development pipeline includes a 5 GWh thermal-battery project, while Project Big Stone demonstrated a deployment pathway from construction toward energy delivery in less than 12 months.
9. Malta Inc.
Company Overview: Malta Inc. became an independent company in 2018 after originating from an energy-storage concept developed within Alphabet's X innovation organization. Headquarters: Cambridge, Massachusetts, United States. Core Long-Duration Energy Storage Expertise: Malta develops thermal and electro-thermal systems designed to convert electricity into stored heat and subsequently dispatch energy when grid or industrial demand requires it. The company's high-temperature heat-pump platform operates across temperatures reaching approximately 550°C, expanding the technology beyond electricity storage into industrial decarbonization. Major Products and Services: Malta's Steam Energy Management and Storage platform addresses utility-scale LDES, while its commercial work also includes industrial heat projects. A partnership announced in 2024 evaluated storage projects in the 200–500 MW range and a potential portfolio reaching 1 GW across Europe and the United States.
10. e-Zinc
Company Overview: e-Zinc was founded in 2012 and has progressed its zinc-based energy-storage platform from laboratory development into pilot manufacturing. Headquarters: Mississauga, Ontario, Canada, where the company established a 42,000-square-foot facility incorporating its Canadian headquarters, engineering operations, R&D and pilot production. Core Long-Duration Energy Storage Expertise: Its technology electrochemically stores energy by depositing zinc metal and is designed to provide considerably longer discharge than standard lithium-ion batteries, including configurations targeting roughly 24 hours. The system is engineered for operating temperatures extending from approximately −30°C to 60°C. Major Products and Services: e-Zinc has conducted pilot work with industrial partners including Toyota Tsusho and introduced AI-assisted quality inspection in 2026, showing how machine vision and analytics are entering next-generation LDES manufacturing.
4. Regional Outlook
North America
North America has become one of the most active regions for non-lithium long-duration energy storage commercialization, particularly in California. The state's battery-storage capacity expanded from less than 700 MW at the beginning of 2019 to more than 21,000 MW by mid-2026, creating operational experience with large quantities of grid storage. California separately established a 1,000 MW procurement requirement for long-duration energy storage, helping distinguish extended-duration projects from the short-duration lithium-ion fleet. At least 7 demonstration projects had received state support by late 2024 under programs emphasizing non-lithium technologies capable of 8 hours or more of discharge. Hydrostor's 500 MW/4,000 MWh Willow Rock project is among the largest projects advancing through this environment.
U.S. activity also includes Form Energy's 100-hour iron-air platform, ESS iron-flow systems, Energy Vault's 48-hour Calistoga resilience facility, e-Zinc pilot partnerships and Energy Dome's 10-hour project development in Arizona. California's proposed Prairie Song storage facility illustrates the scale of the wider market, with an 8-hour, 1,150 MW/9,200 MWh configuration. Canada contributes through Hydrostor's compressed-air expertise and e-Zinc's pilot manufacturing, while Ontario expected at least 1,217 MW of storage participating in its market by 2026, compared with 228 MW previously. Mexico has substantial renewable and industrial potential, but dedicated LDES manufacturing and commercial deployments remain less mature than in the United States and Canada. Regional challenges include interconnection queues, permitting, first-of-a-kind project risk and the need for longer-term procurement structures.
Europe
Europe's LDES environment combines established pumped-storage infrastructure with newer flow, liquid-air, CO₂ and thermal technologies. The European Union's renewable-energy framework sets a binding target for at least 42.5% renewable energy by 2030, increasing the need for storage capable of balancing variable generation across longer intervals. Europe had roughly 89 GW of electricity-storage capacity in 2024, with pumped hydro forming the majority, while European policy analysis indicates that total storage requirements could exceed 200 GW by 2030. The European Commission adopted a dedicated recommendation on energy storage in March 2023, encouraging member states to remove regulatory barriers, recognize flexibility value and account for storage in network planning.
The United Kingdom is developing one of Europe's clearest LDES support systems, having opened the first cap-and-floor application window in April 2025 for projects meeting extended-duration requirements. Ofgem continued project assessment through 2026 and received 44 responses to one consultation on the assessment framework. Highview Power's 300 MWh Carrington liquid-air project and multi-GWh expansion plans are aligned with that market structure. Italy hosts Energy Dome's 20 MW/200 MWh CO₂ Battery, Sweden and the United Kingdom support vanadium-flow development through Invinity's deployments, and Ireland is attracting 200 MWh-class CO₂ projects connected with data-center requirements. Europe nevertheless faces permitting complexity, grid-connection constraints and competition between established pumped hydro and first-of-a-kind technologies that require different commercial contracts.
Asia-Pacific
Asia-Pacific combines the world's largest pumped-storage build-out with ambitious new long-duration procurement programs. China had 62.37 GW of pumped-storage hydropower operating by the end of August 2025, alongside more than 1,690 GW of combined wind and solar capacity. Pumped hydro therefore remains central to China's long-duration flexibility strategy even as the country also deploys gravity storage, compressed air, flow batteries and other new technologies. Energy Vault has developed a 25 MW/100 MWh gravity-storage system at Rudong and a 17 MW/68 MWh project at Zhangye, demonstrating commercial-scale deployment beyond conventional electrochemical batteries. China's large equipment-manufacturing base also supports turbines, pressure vessels, power electronics and grid-integration components required across multiple LDES technologies.
Australia is emerging as another major LDES market. New South Wales retains an 8-hour minimum duration requirement and has established objectives of 2 GW/16 GWh by 2030 and 28 GWh by 2034. By February 2025, the state reported that contracted projects represented 40% of its 2030 long-duration target, while additional tender rounds announced in 2026 sought another 12 GWh. Hydrostor's Silver City project contributes 200 MW/1,600 MWh, and Energy Dome announced a 20 MW/200 MWh Victorian project in July 2026. India is also expanding storage demand as it pursues a national target for 50% of cumulative installed electricity capacity to come from non-fossil sources by 2030. Japan, South Korea and Southeast Asian economies possess advanced industrial supply chains, but dedicated non-pumped-hydro LDES commercialization remains more selective than in China and Australia.
Middle East & Africa
The Middle East is creating increasingly suitable conditions for LDES as Gulf states add solar generation and seek reliable electricity through evening and overnight periods. Dubai's Hatta pumped-storage hydropower plant provides 250 MW/1,500 MWh, equivalent to approximately 6 hours of full-power output, and is designed for an operating life approaching 80 years. The Mohammed bin Rashid Al Maktoum Solar Park also includes concentrated-solar infrastructure with approximately 15 hours of thermal storage, demonstrating that long-duration energy shifting is already being incorporated into large renewable projects. These systems are particularly relevant in Gulf climates where high daytime solar production, evening cooling loads and temperatures above conventional battery comfort ranges can reward technologies based on water, thermal media, compressed gases or other non-lithium approaches.
Africa's electricity-storage landscape remains dominated by pumped hydro, conventional batteries and early-stage renewable-storage procurement rather than a large dedicated LDES manufacturing base. South Africa has decades of operating experience with pumped-storage infrastructure, including the 1,332 MW Ingula/Braamhoek scheme developed with 4 reversible pump-turbine units. New long-duration technologies could complement such infrastructure in mining operations, isolated industrial sites, microgrids and renewable-energy zones where outages lasting beyond 4 hours cannot be addressed economically by standard backup systems alone. The largest barriers across African markets remain transmission constraints, project financing, specialist engineering capability and dependence on imported equipment. The opportunity is therefore strongest for modular systems capable of operating with limited maintenance, extreme temperatures and renewable generation distributed across geographically remote areas.
5. Future Opportunities in the Long-Duration Energy Storage Industry
Future opportunities for the Top Companies in the Long-Duration Energy Storage Industry will increasingly depend on matching storage duration to specific grid and industrial requirements rather than maximizing one universal performance metric. The LDES Council has identified an industry pathway requiring as much as 8 TW of long-duration capacity globally by 2040, compared with a project pipeline measured at roughly 0.22 TW in 2024. That target is not a completed deployment forecast, but it illustrates the scale of flexibility that highly renewable power systems may eventually require. Technologies capable of 8–24 hours can address overnight renewable shifting, while 48–100-hour platforms can target multi-day weather events, capacity adequacy and resilience. Thermal systems can also bypass electricity reconversion by supplying stored heat directly to industrial users, improving system utilization in steel, chemicals, food processing and other thermal-load sectors.
Artificial intelligence, automation and advanced analytics represent another development path. e-Zinc had already introduced AI-supported quality inspection by 2026, while LDES manufacturers increasingly use automated cell assembly, predictive maintenance, digital twins and real-time state-of-charge modelling. Data centers themselves are becoming an addressable market: Form Energy's 12 GWh AI-infrastructure agreement and Energy Dome's 200 MWh Irish project show that grid-scale storage can become part of computing infrastructure rather than remaining solely a utility asset. Hybrid systems combining fast-response batteries with long-duration technologies can allocate sub-second services to one asset and multi-hour energy delivery to another. This architecture could improve equipment utilization while allowing storage projects to participate in several grid services.
Geographic localization will also matter through 2030. California has established a 1,000 MW LDES procurement requirement, New South Wales targets 16 GWh by 2030, and the European Union is working toward a 42.5% renewable-energy share in the same year. These are verified policy objectives rather than guarantees of individual company deployment. Their importance lies in creating repeatable demand conditions under which manufacturing capacity, workforce training, engineering standards and service networks can develop. Companies able to standardize modules while adapting them to different climates, grid codes and permitting regimes will be positioned to serve utilities, industrial facilities, renewable developers, data centers, remote communities and resilience projects across multiple continents.
6. Conclusion
The global long-duration energy storage industry in 2026 combines mature infrastructure such as pumped hydro with rapidly commercializing iron-air, flow, compressed-air, liquid-air, CO₂, gravity, hydrogen and thermal-storage technologies. The industry's 5 defining trends—multi-day batteries, 10-hour thermodynamic projects, AI data-center demand, 8-hour-plus procurement policies and technology diversification—show why LDES cannot be evaluated as a single battery category. Form Energy's 100-hour platform, Hydrostor's 4,000 MWh Willow Rock project, Energy Dome's 200 MWh systems and Highview Power's 300 MWh liquid-air project demonstrate how different engineering approaches are being matched to distinct grid requirements.
The Top Companies in the Long-Duration Energy Storage Industry are therefore competing through storage duration, project scale, operating life, manufacturing capability and application specialization rather than one common chemistry. North America is advancing 1,000 MW-class procurement programs and multi-day technologies, Europe is developing an 8-hour-plus policy framework and liquid-air and CO₂ projects, Asia-Pacific combines 62.37 GW of Chinese pumped storage with Australia's 28 GWh LDES objective, and the Middle East is already operating gigawatt-hour-class pumped and thermal systems. Through 2030 and beyond, the strongest opportunities will center on renewable firming, AI data centers, industrial heat, critical infrastructure and multi-day grid resilience, with technical bankability and verified operating performance remaining decisive competitive factors.